UK based Datawind on Saturday said that it manufactured about 10,000 Aakash2 tablets in China for the sake of 'expediency', as it couldn't get any supplier in India to start assembling the tablets in time. "For the first 10,000 units (of Aakash2) for IIT, and for expediency sake we had the motherboards and kits manufactured in our Chinese subcontractor's facilities, and then the units have been 'kitted' in China at various manufacturers for expediency," said Suneet Singh Tuli, Datawind CEO.
Monday, November 26, 2012
Aakash2 tablets made in China for expediency: Datawind
UK based Datawind on Saturday said that it manufactured about 10,000 Aakash2 tablets in China for the sake of 'expediency', as it couldn't get any supplier in India to start assembling the tablets in time. "For the first 10,000 units (of Aakash2) for IIT, and for expediency sake we had the motherboards and kits manufactured in our Chinese subcontractor's facilities, and then the units have been 'kitted' in China at various manufacturers for expediency," said Suneet Singh Tuli, Datawind CEO.
Subscribe to:
Post Comments (Atom)
-
Introduction To LED Panel Meter with LED Drivers The Intersil ICL7107 is a low power, 31/2 digit A/D converters that is used to drive LED ...
-
Roughly nine months after the PlayStation 4 went on sale, Sony’s new console has sold more than 10 million units. That makes it the fas...
No comments:
Post a Comment